0419 024 336BOOK NOW

Raby Bay Piling

In August 2015 our barge 'Icebreaker' was in Raby Bay to carry out a project which involved installing piling to correct revetment wall failure. 'Icebreaker' was custom built for the express purpose of canal maintenance like this.

Unlike larger barges it is designed to fit under most bridges and between pontoons.

Different to smaller aluminium or fibreglass barges, it can provide a very stable platform for up to 20t machines to get into those tight spaces. With our hydraulic ramp we can bring these machines right in close without damaging existing structures and property.

DON'T WAIT UNTIL YOU GET A FINE, CONTACT US TODAY

Request a quote